Friday, December 11, 2009

large roof framed



Paul nailing the last barge and the large roof and extended dormer are finished!!!!!

Monday, December 7, 2009

north roof sheathing

Paul finished off the rest of the sheathing on the north roof amidst 40 kmh winds! My job required me to stay where it was safe and hand him the sheets!

wayward dormer


surveyor found out dormer roof is too high even though it is lower than the main roof which is 1.5 feet lower than the main required height - adjusting the dormer overhang to meet criteria

Saturday, December 5, 2009

wishful thinking!


the old man dreaming of sitting in the soaker tub!

roof sheathing


Tara and Wade in their monkey suits sheathing the roof!

Paul the master framer



Paul framing the dormer and acknowledging the world! Paul's almost finished dormer

Wednesday, December 2, 2009

roof framing



view from south showing ensuite dormer & first wrap around