Saturday, January 30, 2010

interior basement framing



floor concrete all poured and started lower level interior framing

Thursday, January 28, 2010

concrete floors





large crew arrives and use a line pumper to pour the concrete
power trowelling the garage floor and hand trowelling some of the main floor in preparation of finishing the concrete

Wednesday, January 27, 2010

windows and rain screen


radiant floor tubing




top left main floor tubing - top right is where the tubing will connect to the hot water tank( sure hope someone labeled the runs! -bottom left lower level tubing - bottom right Wade, Tara, & Paul finishing the wire mesh

Monday, January 25, 2010

Radiant floor tubing

Radiant floor water tubing being laid in the lower floor.

Garage slab final prep



Tara putting her many years of education to work! Garage slab preparation finished rebar laid.

forest friend


Two raccoons came to visit and slept most of the day up in the tree behind the house.

Wednesday, January 20, 2010

ready for radiant piping


under slab styrofoam insulation installed in the lower floor and covered with poly, -wire mesh laid down and awaiting the plumber to install the radiant tubing.

Wednesday, January 6, 2010

main floor stairs


Looking down from the upper floor to the main, and the stairs from the main floor to the upper floor.

Another quality job from the stair professionals, Paul & Tara!

front entry roof framing


Back to work after two weeks off for Xmas.