Wednesday, January 20, 2010
ready for radiant piping
under slab styrofoam insulation installed in the lower floor and covered with poly, -wire mesh laid down and awaiting the plumber to install the radiant tubing.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
▼
2010
(75)
►
September
(3)
►
August
(5)
►
June
(1)
►
May
(11)
►
April
(15)
►
March
(17)
►
February
(6)
▼
January
(17)
interior basement framing
concrete floors
windows and rain screen
radiant floor tubing
Radiant floor tubing
Garage slab final prep
forest friend
ready for radiant piping
below slab plumbing
view from park
upper floor framing
roofer finished!
shingles yah!!!!!!!!!
back deck
roof ready for shingles!
main floor stairs
front entry roof framing
►
2009
(45)
►
December
(16)
►
November
(23)
►
October
(6)
About Me
carl
View my complete profile
No comments:
Post a Comment